Sign In | Join Free | My insurersguide.com
China Hebei Oulite Import&Export Trading Co.,Ltd logo
Hebei Oulite Import&Export Trading Co.,Ltd
Hebei Oulite Import&Export Trading Co.,Ltd Once time cooperation,whole-life after sales service
Active Member

6 Years

Home > Wire Mesh PVC Coating Line >

Full Automatic Green PVC Powder Coating Line , Wire Mesh Coating Production Line

Hebei Oulite Import&Export Trading Co.,Ltd
Contact Now

Full Automatic Green PVC Powder Coating Line , Wire Mesh Coating Production Line

  • 1
  • 2

Brand Name : OLT

Model Number : OLT-PMPL-01

Certification : ISO9001

Place of Origin : China

MOQ : 1set

Price : Negotiable

Payment Terms : L/C, T/T

Supply Ability : 5sets per month

Delivery Time : 15days after deposit

Packaging Details : nude packing

Products name : Full automatic panel mesh green color pvc powder coating line

Max product size : Length 3000*Width 200*Height 2000mm

Max product weight : 10 kg/pc

Treating method : Powder coating

Working system : 8h/ shift

Product conveying method : hanging conveyor chain

Contact Now

Full automatic panel mesh green color pvc powder coating line

1. Panel mesh pvc powder coating line basis Information:

The main body of the drying tunnel adopts a profile skeleton, and the inserting plate is combined with a thermal bridge type thermal insulation structure. Easy to transport, easy to install.

When installing, lining the aluminum silicate with a thickness of 10mm at the insert of the furnace piece and hitting the high temperature sealant. Outer angle of the furnace body, medium rock wool. Make sure there are no leaks at the seams. The average surface temperature of the outer wall of the drying tunnel is not higher than the ambient temperature by 10 ° C when the ambient temperature is 20 ° C.

The assembled plate is divided into an inner plate and an outer plate, the inner plate is made of δ1.2 mm stainless steel plate, and the outer plate is made of δ0.8 mm steel plate. The inner and outer plates are filled with 200mm rock wool insulation, and the furnace ribs are punched to reduce heat transfer and heat bridge, thereby ensuring good thermal insulation of the furnace wall.

2. Panel mesh pvc powder coating line characteristics:

The flow chamber has excellent airflow control performance, minimizing the dead zone, the floating powder layer is relatively stable, there is no powder spillage phenomenon, and the powder adhesion rate is high.

It adopts the combination of type plate and bolt locking, which is convenient and quick to transport and install, convenient and safe to operate and maintain.The fluidized bed is supplied by a high-pressure Roots blower, and a pressure regulating valve is installed at the outlet of the gas pipe.

3. Panel mesh pvc powder coating line parameter:

Material Steel parts
Max product size Length 3000*Width200*Height2000mm
Treating method Powder coating
Production line speed 15-20m/min(continuously adjustable)
Production capacity 400pcs/day
Equipment comprehensive operation rate 90%

energy

Electric

220VAC; 380VAC;50Hz;

oltage fluctuation range: ±10%

Industrial water 0.2~0.3MPa
Heating heat source
  • drying furnace heating using liquefied petroleum gas hot air furnace

Factory effective area Length 48m*Width12m*Height6.0m
Design Overview This equipment includes 1 set of preheating drying furnace, 1 set of powder plasticizing furnace, 1 set of fluidized bed device, 1 set of vibration device, 1 set of suspension conveying device and 1 set of electrical control device.

4. Service:

1. The equipment production company is responsible for providing users with instructions on the use of equipment and training operators.

2, the product warranty period is one year, in the warranty period, if there are quality problems in the product parts, if the user is not responsible, the equipment production company is responsible for the repair.

3. After the equipment is in operation, the equipment production company is responsible for tracking the service for half a month.

4. Regularly visit the user and solve the equipment related matters on the spot.

5. The equipment manufacturing company provides lifelong technical guidance services for the equipment provided.

6. After the expiration of the warranty period, the equipment production company received the customer's fax, and rushed to the customer's site in 36 hours to solve the problem. The expenses incurred in the repair were charged according to the actual cost price standard.

5. FAQ:

Q: Where is your factory located?

A: Our factory is located in Anping county, Hebei Province.Our nearest international airport is Beijing.We can pick you up from Shi Jia Zhuang airport or train station.

Q:How many years your factory established and how many workers you have

A:Our factory established nearly 30 years.And we have about 35 workers in our factory now.

Q:What is your machine guarantee time?

A:One year since machine was at buyer's factory but within 18 months against B/L date.But we supply whole-life on line free after sales service

6. Company informations:

Hebei OLT wire mesh machine company with 55 employees,9000 square meters workshop,more than 30 yesrs experience in metal wire mesh fence.All these help us to be the leading manufacture in Metla wire Mesh and wire mesh mahcinery fied,Dealers from all over country are welcome to visit and purchase.

Full Automatic Green PVC Powder Coating Line , Wire Mesh Coating Production Line


Product Tags:

wire coating equipment

      

powder coating line

      
Cheap Full Automatic Green PVC Powder Coating Line , Wire Mesh Coating Production Line for sale

Full Automatic Green PVC Powder Coating Line , Wire Mesh Coating Production Line Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hebei Oulite Import&Export Trading Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)